RATP Dev, a subsidiary of the state-owned Parisian transport operator RATP, has been awarded a seven-year contract to operate the public transport network in the greater Nancy area of France. The agreement with the Syndicat Mixte des Mobilités du Bassin Nancéien (SMBN), the responsible mobility authority, runs from 2027 to 2033. The operator transition is scheduled for 1 January 2027, with RATP Dev replacing Keolis as the current operator of the STAN transport network. Keolis has managed the network in the greater Nancy area since January 2019, with its existing contract set to expire at the end of 2026.

25 trolleybuses procured last year

According to RATP Dev, the network comprises a total of 257 vehicles and serves around 340,000 residents and provides over 20 million passenger trips annually. A key component of the new contract is the further electrification of the bus fleet. Currently, battery-electric buses and trolleybuses together account for just 11 per cent of the total 257 vehicles. In April 2025, the previous operator, Keolis, inaugurated the city’s first trolleybus line and procured 25 units of the HESS Lightram 25 DC trolleybus model.

By 2033, the share of battery-electric and trolleybuses is to increase to 35 per cent. At the same time, RATP Dev has committed to reducing the CO₂ emissions of the transport network by 38 per cent over the seven-year contract period. The company has not yet disclosed how many additional electric buses will need to be procured or which vehicle types will be deployed.

A unified network for four local authorities

For the first time, the new transport contract involves merging the public transport services of four local authorities in north-eastern France: the Nancy Metropolis, as well as Bassin de Pompey, Sel & Vermois, and Moselle et Madon. The unified network will include five main bus lines, one of which will be a fully electric trolleybus line. In addition, there will be 30 regular bus lines, 28 school bus lines, two night services, and five on-demand transport services. Park-and-ride facilities are also part of the contract area.

During the operator transition at the beginning of 2027, the continuity of the existing service will first be ensured. At the start of the next school year, a reorganisation of the network with improved services on key transport routes is planned. Further changes are scheduled for 2029 and 2030. By 2030, line T2 is to be converted into a low-emission Bus Rapid Transit (BRT) route, a high-performance bus connection with corresponding infrastructure upgrades.

In addition to modernising the fleet, RATP Dev also aims to standardise digital services and access to public transport. The existing STAN brand will be used across the entire new transport area. A harmonised fare system is planned from 1 August 2027. Furthermore, the existing on-demand bus services will be consolidated under the Rivéo brand. A new Mobility-as-a-Service (MaaS) app will combine real-time information, mobile tickets, and the booking of on-demand transport. Passengers will also be able to pay contactlessly with bank cards directly on board the vehicles.

“This project reflects a bold and inspiring ambition: to bring mobility services together across a single functional urban area, creating stronger connections between communities, residents and opportunities,” said Hiba Farès, Chairwoman of RATP Dev. She added that the initiative embodies a strong vision of regional cooperation and cohesion beyond the creation of a unified transport network.